Arrived at 8:01 and immediately received a call from Earthwalk checking on our equipment. sent in the SN of the two powerbricks that were not functioning correctly so we can get replacements.
Talked to Sheila about setting up her computer in PD area to attend webinar next week. She couldn't attach to the public wireless so I recommended she use a cable that was available instead of the wireless. I will need to check the wireless access later today.
Talked to Marcia and Allison about setting up for webinar on AR Digital Sandbox tomorrow
Talked to Carl about the upcomming workshop and how we wanted to proceed
worked on budgeting and travel expenses
took wireless tablet to pd area to check connectivity issue. seemed fine in the PD area and through out the building. I talked to Sheila and it seems she didn't do very well on the wire either (weird) so she moved to J conf room and connected just fine.. She didn't have time for me to troubleshoot the issue and she was just going to use the J Conf room for her webinar
Checked with Warren about connectivity and we can get 6 mg from the 635 line number.. so I told him to have the phone company start the install.. YAHOO
Talked with Mr. Fenter about budget and bandwidth situation
worked on IP configuration and location information to update lists preparing for new broadband connectivity.
Talked to Marilyn about moving her database server to private IP
worked with Sheila to get connection on the ethernet cable
set up CIV for Pat in H
1:30 left for Fendale for TIE work this evening