Tuesday, May 31, 2011

Tuesday May 31

Arrived at 8:09 (a bit late due to traffic in Van Buren).  some issues with Novell login computers.. (forgot to restart the WAESC server since it was in a different building.  Got everyone logged in and accessing the internet.
Caught up journal from last week.
worked on financial and purchasing questions with Mr. Fenter and Patsy
Left at 11:45 to go to dentist (yeah.. not)

Tuesday May 31 Catch up from previous week

Friday May 27 - Electricity came back on so I came in on the holiday and made sure that all the servers in the tech office and the dl office were running correctly.  I also switched the firewall to intercept ALL traffic directly from the router rather than in line with the LAN.

Thursday May 26 - Coop closed due to Electrical outage

Wednesday May 25 - was supposed to have workshop but Coop had electrical outage to due storms and near by tornadoes.  worked at the office for a bit and went to Alma to assist with IDEAS login issues (STINs for non-teachers and STINs for Administrative personnel)

Tuesday May 24 - worked on setting up BigBlueButton on Virtual Server and various minor computer issues

Monday May 23 - Leave to assist my son who lost everything in the Joplin tornado

Friday, May 20, 2011

May 20, 2011

Catch up for the week

Wednesday - Windows 2008 server workshop

Thursday - assisted Alma with STIN, assisted Charleston with e-rate, cleaned up room from workshop, worked to install windows 2008 server on Nobilis, checked on prices for servers since the nobilis was not going to be able to use 2008r and various computer issues such as g-mail on IE9, then Supt Meeting

Friday - CIV Conversations with Debbie Coffman for the morning, checked on VMWare for the Nobilis (not supported - needed the V mb which we don't have).  Helped MtBurg with STIN issue.  decided to try and install VMWare on the Nobilis server anyway and it seemed to work just fine.  Will know more when I try to install OS and APPS on Monday.

Tuesday, May 17, 2011

Tuesday May 17

Server 2008 workshop
worked til 6:00 trying to get server installed on coop computer.

at 9:15 pm called teacher from County Line school and explained how to access his records from IDEAS to show his PD coordinator.

Monday, May 16, 2011

Monday May 16

Arrived at 8:00 and caught up journal from Friday when Blogger was down.
worked on Marilyn M computer to provide private static IP and verify that system would work as needed for her data base.  This is in preparation for the addition of DSL, and Aggregator for additional bandwidth needs.
9:00 started patching servers (monday routine)
9:50 discovered that the web server was not accessing the internet or accessible from the internet.  checked configuration and looked fine so re-boot to see if that correct issue.  also checked the patch cables and they seemed fine.
worked on Lorrie S computer, running Malwarebytes to see if issue may be malware
email tech coord about Impero free promotion to the coops and cost for volume license purchase and can still bill each school separately
Assist Jennifer H with setting up work email on cell phone
check out IE9 to help decide if we need to upgrade at coop level
set up for Windows 2008 workshop

Friday May 13

worked on various computer issues and phone support for IDEAS, AR Digital Sandbox and APSCN installation issues.  
provided workshop webinar for AR Digital Sandbox for Media Specialist meeting and then added the media specialist users into the AR Digital Sandbox system.

Thursday, May 12, 2011

Thursday May 12

Arrived at 8:01 and immediately received a call from Earthwalk checking on our equipment.  sent in the SN of the two powerbricks that were not functioning correctly so we can get replacements.
Talked to Sheila about setting up her computer in PD area to attend webinar next week.  She couldn't attach to the public wireless so I recommended she use a cable that was available instead of the wireless.  I will need to check the wireless access later today.
Talked to Marcia and Allison about setting up for webinar on AR Digital Sandbox tomorrow
Talked to Carl about the upcomming workshop and how we wanted to proceed
worked on budgeting and travel expenses
took wireless tablet to pd area to check connectivity issue.  seemed fine in the PD area and through out the building.  I talked to Sheila and it seems she didn't do very well on the wire either (weird) so she moved to J conf room and connected just fine.. She didn't have time for me to troubleshoot the issue and she was just going to use the J Conf room for her webinar
Checked with Warren about connectivity and we can get 6 mg from the 635 line number.. so I told him to have the phone company start the install.. YAHOO
Talked with Mr. Fenter about budget and bandwidth situation
worked on IP configuration and location information to update lists preparing for new broadband connectivity.
Talked to Marilyn about moving her database server to private IP
worked with Sheila to get connection on the ethernet cable
set up CIV for Pat in H
1:30 left for Fendale for TIE work this evening

Monday, May 9, 2011

May 2 - 6 Journal

May 6 - Federal Program Coordinators meeting in Little Rock (due to travel with wife and TIE Module workday failed

May 5 - CoopTCC Meeting, TIE Module development, Tech Plan CIV (4 - 5:30) at Camden

May 4 - APSRC Technology Institute (Attended iPad, iTunes, Digital Sandbox, and Cyberbullying workshops

May 3 - Worked on Budget issues and ordering Wireless and iPad for co-op as well as worked on various computer problems

May 2 - Worked with Shelby on Pam Van Meters new computer, patched the Migrant and PD servers (updates), exchanged back up harddrives with Jason and worked on Paris CIV system to enable recording for the Friday Tech Plan CIV.

May 9

Started to catch up on journal and accidently wiped out a weeks worth of actions.  I was frustrated and decided to work on E-rate instead.  Will return to the journal later after stress relief.  No news from E-rate yet so must still be in review process but no PIA activity yet.
8:45 - head to main office to check mail and messages from the week.
Sent out messages to e-rate coord about Item 21 attachments with instructions
send out messages to tech coord about windows 2008 server workshop and May monthly meeting.  Contacted Debbie S about presenting on Live@edu for the tech bunch.
Talked to Robin F (Alma) about IDEAS (emails were getting blocked on both sides)
Talked to Paul E (Charleston) about issues with internet connectivity
Talked to Rick Siddiq about Impero demo lab at coop.. will check with Mr Fenter for permission
Talked to Bill F (Telecomp) about not getting the job of the wireless he wanted to know how off he was and I told him that I wasn't sure I could do that but that if given permission I would let him know but he wasn't WAAY off.
Talked to Jason about exchange of hard drives.
worked with Scott Organ on CIV issues
worked with Warren on BEE project issues, the connectivity was less than desired on the 965 number so he is doing the test on the 635 number since Eric had gotten 6 mg connectivity on his line.
also discussed the idea of using the Ecessa box as our firewall device.  Share that info with Shelby and she thought that was a great idea since DIS would be able to give support for that device.  I also told her that would be helpful if I were to retire that the next tech person would not be saddled with another of my OpenSource devices especially if they were not comfortable with Linux OS.
4:30 - 4:50 - helped Pat Yick overcome password issue with Google Mail and Internet Explorer