October 3 – Hackett Schools to assist with D2SC online testing and set up 8e6 web filter

October 4 – attend the TCC meeting over CIV then worked on inventory, paperwork and technology issues that had built up while I was on leave.

October 5 – Hosted/attended a two day Ecessa / 8e6 workshop taught by Krissy Cross from DIS.

October 6 – Day 2 of workshop and worked with Krissy to improve my Ecessa firewall

October 7 – Office to correct issues created by modifying the filter and lost password then to Mountainburg to assist with e-rate and technology planning

October 10 – caught up email, worked more on inventory, set up computers for workshop, worked on Linda's computer, assisted Elda with e-mail pop up

october 11 – worked with Paris on Forefront instruction. We made it through the process more quickly but still don't have the steps in great order. We believe there will need to be one more installation and plan to do that at the coop on coop server

October 12 – Worked on and completed inventory, went to Paris to help Jodi with e-rate

October 13 – Worked on catching up calendar and journal while assisting with D2SC (Bonneville) and email (Harvie and Elda)

September


September 1 – ran the AP teleconference and took half day leave

September 2 – worked on updating information on co-op web site, assisted Jay (Scranton) with e-rate and finished up the web site update

September 6 – Attended the TCC meeting at Arch Ford

September 7 – ran the CIV for ADE State reporting and made some corrections to the web site that I had overlooked

September 8 – E-rate 472, 468 and beginners overview workshop for area schoools and set up computers for workshop in conf J, set up some of the ECP iPads

September 9 – Leave

September 12 – Stopped by co-op to see if workshops were getting under way and then went to Paris to assist technology coordinator Jason to get Forefront Protection services running

September 13 – Assisted with target assessment / CCSS workshop for testing coordinators and technology coordinators, set up more ECP iPads

September 14 – taught erate 470 workshop, set up more ECP iPads

September 15 – set up remainder of ECP iPads, ran CIV for OSR monitoring meeting, made sure that computers were ready for Early childhood workshop.

September 16 – CIV conversations

September 19 – broke down all portable computer labs and replaced in containers, caught up on email, updated all servers including migrant. Linux servers had issues and had to work until 7:30pm

September 20 – finished up the updating servers and various other minor issues with computers, email and printers that have built up over the last 2 weeks.

September 21 – D2SC online testing training at Arch Ford

September 22 – assisted schools with e-rate and attended the Supt meeting. Provided a MOU for distaster recovery operations to the supt.

September 23 – Office time to prepare presentation for D2SC on Monday and work with John and Harvie on setting up portable CIV system in conf J

September 26 – D2SC workshops for online testing to tech coordinators and testing coordinators (two sessions so all day)

September 27 – set up for night workshop, left to take trailer to Fay., came back to help host the School Board workshop from 5 to 9

September 28 – came in the morning to make sure all CIV sessions were working then took off for BBB (leave)

September 29 – Leave

September 30 – Leave